Select Currency
Translate this page

COMPARATIVE ECONOMICS OF PETROLEUM PRODUCTION OPTIMIZATION TECHNIQUES

Format: MS WORD  |  Chapter: 1-5  |  Pages: 73  |  2882 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE FULL PROJECT

COMPARATIVE ECONOMICS OF PETROLEUM PRODUCTION OPTIMIZATION TECHNIQUES

 

ABSTRACT

Hydrocarbon production in the petroleum industry is often constrained by reservoir heterogeneity, deliverability and capacity of surface facilities, also optimization technique in the petroleum industry requires execution of several iterative runs by comparing various solutions until an optimum or satisfactory solution is found. In this study a comparative economic analysis to aid the optimization of petroleum production was done. Two key variables, tubing sizes and choke sizes were considered, their sensitivity to production was also determined. A prudent approach to optimizing petroleum production is by statistical and sensitivity analysis, specifically, Nodal Analysis and @Risk software were used in this work. The nodal analysis procedure consists of selecting a division point or node in the well, the system at that point was analyzed differently to optimize performance in the most economical manner, an integral analysis of the entire production system was also considered. Using @Risk software (Monte Carlo simulation), risk analysis of the objective function was done. Monte Carlo simulation sampling is a traditional technique for using random or pseudo-random numbers to sample from a probability distribution. Substantial findings of this study shows that the tubing size of 1.90-inch had an optimal rate of production for deeper reservoir conditions used in this research using the Nodal analysis technique, also Monte Carlo simulation proves that the price of oil has the highest impact on profit for the probabilistic period of 5, 10, and 15 years followed by the rate of production while the cost of tubing has the least effect.

 

CHAPTER ONE:

1.0   INTRODUCTION

1.1   BACKGROUND TO THE STUDY

Hydrocarbon production in the petroleum industry are often constrained by reservoir heterogeneity, deliverability and capacity of surface facilities. As optimization algorithms and reservoir simulation techniques continue to develop and computing power continues to increase, upstream oil and gas facilities previously assumed not to be candidates for advanced control or optimization have being given new considerations (Clay et al., 1998). An optimization technique is a procedure which is executed iteratively by comparing various solutions till an optimum or a satisfactory solution is found. However, Wang (2003) addressed some problems associated with optimizing the production rates, lift gas rates, and well connections to flow lines subject to multiple flow rate and pressure constraints to achieve certain short-term operational goals. This problem is being faced in many mature fields and is an important element to consider in planning the development of a new field.

Nonlinear Optimization, also known as nonlinear programming has proven itself as a useful technique to reduce costs and to support other objectives, especially in the refinery industry whereas linear optimization is a method applicable for the solution of problems in which the objective function and the constraints appear as linear functions of the decision variables. The constraint equations may be in the form of equalities or inequalities. Furthermore, it had been used to determine the most efficient way of achieving optimal outcome for example, to maximize profit or to minimize cost in a given mathematical model. It can be applied to numerous fields like business or economics situations, and also in solving engineering problems. It is useful in modeling diverse types of problems in planning, routing, scheduling, assignment and design.

Carroll (1990) applied a multivariate optimization techniques to a field produced by a single well. The model used in his research includes a single oil well field. However, only the separator model was compositional, and no engineering parameters were allowed to vary with time. He used two types of optimization routines that is, Gradient methods and Polytope methods. However, Ravindran (1992) applying the same technique but allowed for gas-lift and engineering parameters to vary with time. Again, Fujii in 1993 improved the technique by allowing a network of wells connected at the surface, he also studied the utility of genetic algorithms for petroleum engineering optimization.

Regarding some paper view, the application of optimization techniques to solve problems in the upstream sector of petroleum Exploration and Production has been surprisingly limited not taking into account the enormous important of the E&P activities to the hydrocarbon enterprise and to the global energy systems and the economy as a whole. Over time, development in the petroleum industry resulted in optimization methods improving in its ability to handle various problems. In optimization of a design, the design objective could be to minimize the cost of production or to maximize the efficiency of production.

In this work methodology used include Statistical and Sensitivity Methods:

o   Nodal Analysis

o   @Risk Software (Monte Carlo simulation)

  DOWNLOAD THE FULL PROJECT

COMPARATIVE ECONOMICS OF PETROLEUM PRODUCTION OPTIMIZATION TECHNIQUES

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON COMPARATIVE ECONOMICS OF PETROLEUM PRODUCTION OPTIMIZATION TECHNIQUES INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on COMPARATIVE ECONOMICS OF PETROLEUM PRODUCTION OPTIMIZATION TECHNIQUES?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on COMPARATIVE ECONOMICS OF PETROLEUM PRODUCTION OPTIMIZATION TECHNIQUES?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for COMPARATIVE ECONOMICS OF PETROLEUM PRODUCTION OPTIMIZATION TECHNIQUES, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!