Select Currency
Translate this page

A REVIEW OF APPLICATION OF PRESSURE DERIVATIVE CONCEPT TO MULTIRATE TESTS

Format: MS WORD  |  Chapter: 1-5  |  Pages: 54  |  2551 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE FULL PROJECT

A REVIEW OF APPLICATION OF PRESSURE DERIVATIVE CONCEPT TO MULTIRATE TESTS

 

ABSTRACT

Pressure build-up data in low permeability reservoirs take too long and are usually of poor quality. A pressure buildup test is perhaps the most widely performed transient test. In pressure buildup test, a well which has been producing for some time at a constant rate is shut-in and the bottom hole pressure is measured as a function of shut-in time. It is easier to conduct and interpret than most other transient tests, but often it is not economically feasible to shut in a well with a high production rate for a buildup test. Sand producing wells are not good candidates for long pressure drawdown tests. It is often impracticable to maintain a constant rate long enough to complete a drawdown test. In these cases, a multi-rate flow test should be run instead of buildup or drawdown tests. In most cases, the well is shut-in at the surface and as a result, some of the early time pressure data may be affected by wellbore storage. Actually a well-designed multi-rate flow test may minimize the influence of wellbore storage on pressure data. A new technique based on the pressure derivative concept is presented for interpreting a multi-rate flow test. It is shown here that a Cartesian plot of the pressure derivative data versus a time group is a straight line from which the reservoir permeability can be estimated. It is also shown that for the case of two-rate test, Tiab’s Direct Synthesis technique is applicable for calculating permeability and skin. A step by step procedure is presented for interpreting a multi-rate test using pressure and pressure derivative data. This new technique is illustrated by several numerical examples.

 

CHAPTER ONE

INTRODUCTION

1.1   Background to the study

Pressure transient testing techniques are an important part of reservoir and production engineering. From the analysis of the pressure tests, the reservoir model can be recognized and the reservoir properties can be obtained. In order to determine such characteristics, drawdown and Buildup tests are performed. But to run successful pressure tests, many requirements have to be satisfied. For instance, pressure buildup analysis requires that:

(1)  The well be shut in for a sufficient period of time ∆t and (2) The producing time, during the last constant rate prior to shut in, be four times longer than the total shut in time in order to obtain actual reservoir response. Because we need to shut the well in, the pressure build up test is uneconomical both for high production wells and tight formations due to income loss. Drawdown tests require that: (1) The well be shut in long enough, before the test is run to reach reservoir static pressure. and (2) The flowrate be maintained constant during the entire test, which is quite difficult to achieve in practice. Pressure drawdown tests are not suitable for sand-producing wells.

Consequently, in order to overcome the drawbacks of the conventional single rate tests, a Multirate flow test should be run instead. A Multirate test is a draw down test conducted at several production rates (fig. 1). A well designed, performed, and analysed multirate test yields the same results as a single flowrate test, reduces income loss and removes the effects of flowrate fluctuations on the resulting pressure transient responses. An additional advantage is the minimization of phase redistribution effects. Such a test may be conducted if:

1.  An operator cannot afford to shut in a well for a build up test but wishes to obtain the same type of information that can be obtained from the build up test.

2.  Sand production prevents shutting in the well for a build up test.

3.  Phase segregation prevents the use of build up test.

4.  Required to do so by a regulatory agency as in the case of gas wells.

5. Test began at a constant rate drawdown test, but the rate varied significantly during the test.

Reservoir parameters such as formation permeability, total skin factor, average reservoir pressure, and distance to a barrier if present, can be obtained from a Multirate test. In Multirate test, a well is flowed at a number of constant rates and the flowing BHP are recorded as a function of time. The constant rates should either be in increasing or decreasing order of magnitude. The effect can be modelled by considering a Multirate well to be several single rate well at same location, and each time the rate changes , a new well with rate equal to the total rate change is added to the calculation as shown in fig. 

1.2    Literature Review

A multi-rate test may be characterized by a series of constant flow rates, or uncontrolled variable rate. In fact, pressure build-up testing is a special type of multi-rate well test. The flow meters can aid in the design of both kinds of tests, variable or constant flow rates, and as a direct consequence more accurate analysis and results of their interpretation can be obtained. The approach presented here is based on the assumption that the system is infinite-acting and the logarithmic approximation to the line source solution of the diffusivity equation is applicable. The pressure behaviour caused by a variable flowrate is given by the principle of superposition with time.

The principle of superposition with time is used to develop a plot to determine the reservoir parameters. The principle states that adding solution to a linear differential equation results in a new solution to that differential equation but for different boundary condition. The concept of superposition entails:”Every flow rate change in a well will result in a pressure response which is independent of the pressure responses caused by other previous rate changes”.

  DOWNLOAD THE FULL PROJECT

A REVIEW OF APPLICATION OF PRESSURE DERIVATIVE CONCEPT TO MULTIRATE TESTS

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON A REVIEW OF APPLICATION OF PRESSURE DERIVATIVE CONCEPT TO MULTIRATE TESTS INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on A REVIEW OF APPLICATION OF PRESSURE DERIVATIVE CONCEPT TO MULTIRATE TESTS?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on A REVIEW OF APPLICATION OF PRESSURE DERIVATIVE CONCEPT TO MULTIRATE TESTS?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for A REVIEW OF APPLICATION OF PRESSURE DERIVATIVE CONCEPT TO MULTIRATE TESTS, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!