Select Currency
Translate this page

ISSUES AND SOLUTIONS OF LAND AVAILABILITY CHALLENGES AND MISMANAGEMENT

Format: MS WORD  |  Chapter: 1-5  |  Pages: 69  |  2172 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE FULL PROJECT

ISSUES AND SOLUTIONS OF LAND AVAILABILITY CHALLENGES AND MISMANAGEMENT

 

CHAPTER ONE

INTRODUCTION

1.1   BACKGROUND TO THE STUDY

Abuja the Federal Capital Territory of Nigeria has tremendous importance in the country's life and development. It is a hotbed for political fermentation, such that generates centripetal attraction from all corners of the country, perhaps nowhere has the need for judicious use and preservation of exhaustive land resources become imperative in Nigeria today than the Federal Capital City. From the outcome of the panel set up by the Federal Government led by Justice T.A Aguda to relocate the Federal Capital Territory from Lagos to Abuja, an 8,000km2 land was carved out of the central region of the country to serve as the Federal Capital Territory for the Nation. There was a misconception that the original inhabitants' population to be resettled was only between 25,000 and 50,000. However, a later survey in 1984 revealed that their actual population was about 150,000. More than 30 years later, this population has multiplied many times as a result of natural increase and migration.

It is pertinent to understand that the 8,000km2 as the size of the FCT, was not recommended by the International Planning Associates (IPA), the planning firm that produced the Abuja Master Plan, but by the FCT Location Committee, and has been defined in the 1976 FCT Decree even before the IPA was commissioned in June 1977 to plan the city, with the size as one of the terms of reference. Thus, the Abuja master plan has originally been designed with the concept that the whole area has already been evacuated. It was later discovered that the number of the original inhabitants was grossly underestimated. The resettlement cost was astronomical, to the extent of being higher than the money needed for the city development (Elleh, 2012). It therefore became necessary to change the resettlement policy from total evacuation to phases, depending on the actual area needed for the city development.

In ideal situation what should precede plot allocation are land availability, layout design and provision of infrastructure. In order to avoid waste, plots sizes are supposed to be determined relative to the needs of the allotees. If ones need could be contained in 500m2, then any excess portion beside that is a colossal waste of the land resources. Many others that need it could not get because somebody already has the title. In April 2012, the FCT Minister made a revelation at a stakeholders forum, that 90% of allocated plots in the FCT are not developed, which he attributed to lack of infrastructure. Because aggregate provision of infrastructure in the FCT since existence is not more than 25%. However, it is interesting to note that, till date there are many plots in Phase I that were provided with the infrastructure for almost 30 years, but without meaningful development or are fenced only. Recently, there is another very disturbing revelation. It is plot no 2 cadastral zone E13 Gude District sized 465Ha. The outrageous allocation was made to an Accenture Associates Ltd, with address as no. 3104 Mpape, Kaduna Abuja Expressway. The allocation was made dated just only 2 months to the end of the administration. It is now in the property market, being speculated for billions of naira. Still there are large hectare allocations of the Ebele and Obasanjo farms (Jerremy, 2014).

Land Use and Allocation Committee (LUAC) is to make recommendation for lands allocations, but allocations are at times made before reverting to the LUAC.

The model is a misnomer of Financing Urban Infrastructure with Land Value, Never feasible for affordable housing, Distortion of the sharing formula, Not only providing the infrastructure but also saddling the responsibility of resettlement on the developer.

1.2   STATEMENT OF THE PROBLEM

Abuja officially became Nigeria's capital on 12 December 1991, replacing Lagos, though the latter remains the country's most populous city. At the 2006 census, the city of Abuja had a population of 776,298, making it one of the ten most populous cities in Nigeria. Abuja has witnessed a huge influx of people into the city; the growth has led to the emergence of satellite towns such as Karu Urban Area, Suleja, Gwagwalada, Lugbe, Kuje and smaller settlements to which the planned city is sprawling. This growth has affected land availability thereby creating a lot of challenges, a situation whereby whoever needs a land cannot get it easily. However, the researcher is examining Abuja land availability, the challenges and mismanagement involved with a view of proffering solution.

1.3   OBJECTIVES OF THE STUDY

The following are the objectives of this study:

1.  To examine the challenges of land availability in Abuja.

2.  To identify the issues of land mismanagement in Abuja.

3.  To determine the solutions to the issues of land availability in Abuja.

1.4   RESEARCH QUESTIONS

1.  What are the challenges of land availability in Abuja?

2.  What are the issues of land mismanagement in Abuja?

3.  What are the solutions to the issues of land availability in Abuja?

1.6   SIGNIFICANCE OF THE STUDY

The following are the significance of this study:

1.  The outcome of this study will enlighten the Nigeria public on the land related issues in Abuja. It will educate on the challenges and issues of Abuja land availability with a view of identifying the solutions.

2.  This research will also serve as a resource base to other scholars and researchers interested in carrying out further research in this field subsequently, if applied will go to an extent to provide new explanation to the topic

1.7   SCOPE/LIMITATIONS OF THE STUDY

This study on Abuja Land availability, challenges and mismanagement will cover all the issues related to land availability, mismanagement in Abuja.

LIMITATION OF STUDY

Financial constraint- Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

Time constraint- The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work.

 

REFERENCES

Elleh, Nnamdi, Abuja, the single most ambitious urban design project of the 20th century Jeremy. "Sunday, August 27, 2006 Abuja bush bars". Retrieved 22 November 2013. "Resettlement Issues, Squatter Settlements and the Problems of Land Administration in Abuja, Nigeria’s Federal Capital" (PDF). fig.net. 5th FIG Regional Conference Accra, Ghana, 8–11 March 2006. Retrieved 2007-08-10.

  DOWNLOAD THE FULL PROJECT

ISSUES AND SOLUTIONS OF LAND AVAILABILITY CHALLENGES AND MISMANAGEMENT

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON ISSUES AND SOLUTIONS OF LAND AVAILABILITY CHALLENGES AND MISMANAGEMENT INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on ISSUES AND SOLUTIONS OF LAND AVAILABILITY CHALLENGES AND MISMANAGEMENT?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on ISSUES AND SOLUTIONS OF LAND AVAILABILITY CHALLENGES AND MISMANAGEMENT?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for ISSUES AND SOLUTIONS OF LAND AVAILABILITY CHALLENGES AND MISMANAGEMENT, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!