EXPERT SYSTEM APPROACH TO OVERCOMING EXCESSIVE COST ON BUILDING SITES

Format: MS WORD  |  Chapter: 1-5  |  Pages: 70  |  2110 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE FULL PROJECT

CHAPTER ONE

 

INTRODUCTION

 

1.1      Background of the Study

 

Construction industry is highly competitive industry. To win a construction projects, many construction companies have to work with small profit margin. Many construction companies fail to get profit from their projects because of their lack of capability in developing strategy that based on effective management system (O’Brien and Zilly, 1991). This condition typically caused by limited capabilities of project personnel, which resulted in ineffective project control. For that reason, the focus of project control in most developing countries is in project cost rather than time and 1969 quality (Kazi and Chotchai, 1999). 

 

Expert systems are used to overcome problems in fields from assessment to engineering consulting (RuizMezcua et al. 2011) by employing human expertise in different domains (Qian et al. 2005). Expert systems can be used in any field (Ooshaksaraie et al. 2012). Therefore, using expert systems to solve sophisticated engineering problems that require a significant amount of experience is very common, and researchers have developed many systems for use in different fields (Park et al. 2010).

 

In developing countries such as Indonesia, construction project failures are caused by (Dipohusodo, 1996):

 

x Poor monitoring and control

 

x Lack of documentation on project lessons learned

 

x Not adaptive to information technology development

 

x Delayed and mistakes in decision making

 

There are also constraints that are faced by construction companies which are caused by internal as well as external factors. These factors are considered as sources of risk that potentially resulted in cost overrun (Naoum, 1999). Cost overrun in construction projects in Indonesia like in many developing nations is typically caused by poor weather condition forecast, increased material cost due to inflation, increased labour cost, and lack or project experience (Kaming et al., 1997). A good coordination among project stakeholders using a good control system tool is needed in order to achieve required project performances (Ritz, 1994).

 

There are several variables that need to be controlled in order to control project cost, which include: labours, materials, equipment, subcontract and field overhead (Zhan, 1998; Asiyanto, 2003). Sufficient data, particularly in material costs, is required to have effective monitoring and evaluation process. To support this, a good control system tools is needed.

 

Improvement in construction process is required in order to have a better quality performance management. This improvement should consider factors that directly influence the quality of construction process, particularly those that are related to documenting lessons learned, management techniques and technology used (Arditi and Gunaydin, 1998).

In view of the foregoing, this study was aimed at exploring the application of an expert system approach to overcoming excessive cost on building sites.

  DOWNLOAD THE FULL PROJECT

EXPERT SYSTEM APPROACH TO OVERCOMING EXCESSIVE COST ON BUILDING SITES

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON EXPERT SYSTEM APPROACH TO OVERCOMING EXCESSIVE COST ON BUILDING SITES INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on EXPERT SYSTEM APPROACH TO OVERCOMING EXCESSIVE COST ON BUILDING SITES?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on EXPERT SYSTEM APPROACH TO OVERCOMING EXCESSIVE COST ON BUILDING SITES?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for EXPERT SYSTEM APPROACH TO OVERCOMING EXCESSIVE COST ON BUILDING SITES, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!