ASSESSMENT OF THE COMPRESSIVE STRENGTH OF SOIL CEMENT BLOCK EXPOSED TO NPK FERTILIZER

Format: MS WORD  |  Chapter: 1-5  |  Pages: 75  |  2558 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE FULL PROJECT

ASSESSMENT OF THE COMPRESSIVE STRENGTH OF SOIL CEMENT BLOCK EXPOSED TO NPK FERTILIZER

 

ABSTRACT
 
The large number of farmers, especially the rural farmers, make use of NPK fertilizer for farming. These farmers lack adequate storage facilities for storing farm products. This study is aimed at determining the compressive strength of soil cement blocks (SCB) in contact with NPK fertilizer with a view to study the chemical reaction and ascertaining the suitability of the SCB in the construction of ware houses for the storage of NPK. The SCBs were obtained from a Hydraform block firm constructing an estate in Kuje, LGA Abuja. A total of 150 samples of the SCB, the soil used to produce the SCB, obtained from the site in Kuje LGA.
 
The properties of the soil that determines the cement content and properties of the blocks were investigated in accordance with BS EN 771-1:2011 and BS EN 772-1:2011 respectively. The shrinkage has a value of 5.8% and sieve analysis (clay and silt 0.95%) indicates that the cement content can be increased to improve
the  strength  of  the  SCB.  The  wet  compressive  strength  (1.8N/mm2)  was  78%  of  the  dry compressive strength (2.3N/mm2) and less than 80% as recommended by BS EN 772-1:2011. Chemical analysis of the cement, soil and NPK were carried out, a saturated solution of NPK was determined to produce different concentrations.
 
The solutions were prepared and three blocks selected at random were immersed for 7days, 14days, 21days, 28days, 56days and 90days respectively to ensure adequate exposure to the NPK solution. The compressive strength tests shows that the behaviour of the control differs from those in the solution. It was observed that the control experienced leaching of calcium hydroxide from the cement paste with low compressive strength of 1.64N/mm2. Whereas, the compressive strength of the SCBs in NPK solution was higher at 7days (1.7N/mm2, 1.74 N/mm2, 2.12N/mm2, 2.13N/mm2, 2.11N/mm2). After 56 days and 90 days, a white layer was observed to form within the SCB exposed to high concentrations of NPK. This was related to the likely ions exchange reaction with calcium hydroxide. The SCB were found to be suitable for use in the construction of ware houses to store NPK fertilizer as long as the selection of the soil and block production was based on standard code and the structure is kept dry from moisture.

  DOWNLOAD THE FULL PROJECT

ASSESSMENT OF THE COMPRESSIVE STRENGTH OF SOIL CEMENT BLOCK EXPOSED TO NPK FERTILIZER

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON ASSESSMENT OF THE COMPRESSIVE STRENGTH OF SOIL CEMENT BLOCK EXPOSED TO NPK FERTILIZER INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on ASSESSMENT OF THE COMPRESSIVE STRENGTH OF SOIL CEMENT BLOCK EXPOSED TO NPK FERTILIZER?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on ASSESSMENT OF THE COMPRESSIVE STRENGTH OF SOIL CEMENT BLOCK EXPOSED TO NPK FERTILIZER?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for ASSESSMENT OF THE COMPRESSIVE STRENGTH OF SOIL CEMENT BLOCK EXPOSED TO NPK FERTILIZER, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!