Select Currency
Translate this page

PLANNING FOR EX-LANDFILL REDEVELOPMENT

Format: MS WORD  |  Chapter: 1-5  |  Pages: 72  |  2107 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE FULL PROJECT

PLANNING FOR EX-LANDFILL REDEVELOPMENT

CHAPTER ONE

INTRODUCTION

BACKGROUND OF THE STUDY

This guideline supersedes and replaces the Environmental management of landfill facilities (municipal solid waste and commercial and industrial waste) [EPA 2007]. Any reference to the 2007 Guidelines in any statutory instrument or other publication should now be read as a reference to the Environmental management of landfill facilities – solid waste disposal (EPA 2019). Poor environmental practices have universally led to a degradation of the world’s water, air and land resources. National and international environment protection authorities are continually refining policies, regulation, practices and procedures with the aim of minimising the risk of environmental harm as part of transitioning to a sustainable future. Landfill has an important role to play as part of the transition required to achieve sustainable resource recovery and waste management. The role for landfill primarily involves accepting those wastes that are unable to be ‘avoided, reduced, reused, recycled or recovered’. It is vital that a precautionary approach be adopted to adequately address the environmental risks of landfill facilities, recognising that residual waste composition has changed, and will continue to change over time in response to technological advances in recovery activities. Development and operation of landfill facilities in South Australia are activities of environmental significance that require development approval under the Development Act 1993 and an environmental authorisation in the form of a licence, as specified in section 36 of the Environment Protection Act 1993 (EP Act). This document is intended to provide guidance to landfill operators, developers, planning authorities and regulatory bodies on the site selection, development, design, construction, operation, closure and post-closure management of solid waste landfill facilities which comply with the EP Act. The new information reflects the changing nature of residual waste composition in relation to disposal and the need to design and operate landfill facilities that take into account the changing chemical and physical composition of residual waste, now and into the future. This is especially relevant as South Australia strives to introduce new and innovative resource recovery activities to secure our position as a global leader in resource recovery and waste diversion from landfill.

OBJECTIVES

The principal objectives of this guideline are:

• To promote best practice landfill design, construction, operation, closure and post closure within Nigeria

• To minimise the risk of adverse impacts on the land, water and air environments associated with waste disposal.

• To provide direction, certainty and consistency for the site selection, development, operation, closure and post-closure management of landfill facilities.

• To identify the perceptions of the community on the issues of ex-landfill that influence their acceptance on any recommendation to redevelop the ex-landfill,

• To identify the perceptions of the community on the appropriateness of the type of ex-landfill redevelopment, and

• To identify the function of the development of public park on the ex-landfill according to the community needs and priorities.

 

PURPOSE

This guideline relates to the conduct of a landfill facility for the disposal of solid waste. It sets out the EPA’s expectations for the appropriate conduct of landfill activities in accordance with the EP Act. Compliance with this guideline will be relevant to the EPA’s assessment of whether a person has complied with the legislation (including environment protection policies).

  DOWNLOAD THE FULL PROJECT

PLANNING FOR EX-LANDFILL REDEVELOPMENT

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON PLANNING FOR EX-LANDFILL REDEVELOPMENT INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on PLANNING FOR EX-LANDFILL REDEVELOPMENT?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on PLANNING FOR EX-LANDFILL REDEVELOPMENT?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for PLANNING FOR EX-LANDFILL REDEVELOPMENT, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!