Select Currency
Translate this page

DESIGN AND IMPLEMENTATION COMPUTERIZED POWER MONITORING SYSTEM

Format: MS WORD  |  Chapter: 1-5  |  Pages: 71  |  1310 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE FULL PROJECT

DESIGN AND IMPLEMENTATION COMPUTERIZED POWER MONITORING SYSTEM

 CHAPTER ONE

INTRODUCTION

1.1 Introduction

In a world like ours today there is every need to manage funds in every activity being carried out. It is the concern of every firm to control its finances to ensure that unnecessary expenses are avoided. Financial management in a company has proved to be a great task involving the monitor of almost all departments of the company. As such, companies tend to be severe about the tools being used to manage these resources of theirs. This is because financial resources have to do with figures, calculations and computations which may present errors if not properly handled. To this end a computerized system will go a long way to sort many issues in managing financial affairs.

Monitoring power and issuing its bill is the job of Power Holding companies, and they intend to present this information to their customers/subscribers on time and precise. In Nigeria the situation is not different. The Power Holdings Company Nigeria (PHCN) PLC has been on the job for decades now. The issue now is how is it being done and whether the method being used yields the best results? With the growing rate of technology in our world today the question is not far fetched.

The use of manual means of manipulation of records has been proved to have different flaws attached to it so companies are gradually turning on to information technology for aid. Offices are no longer known for the piles of paper and files that it usually had. Rather it is made of devices that make up an automated office system, devices like, desktops, laptops, printers, scanners, etc.

A computerized system according to Friaser, C. (2007), involves the use of computer devices and connections to achieve tasks in a corporate environment. Using this type of system to manage activities will help solve problems of familiar problems being presented by manual systems.

This research project is focused on showing how a computerized system can be modeled to monitor power outage and present bills for it. It studies the characteristics of a computerized system and its components.

1.2     Statement ff Problem

Over the years electricity monitoring in PHCN(usually known as NEPA) has been operated using manual systems and this constitute irrespective of its innate and intrinsic shortfall. When customers go to the billing sections to pay up their accrued bills, they get entrapped in long interminable queues to inefficient machines. In light of this, payment of bills turns out to be hard nut to crack for customers. On the other side of PHCN officials, it has been a tedious and cumbersome task to be abreast of the condition of electricity cables, transformers etc, and these inabilities contributes to their poor and torpid attention to critical power problems. As a matter of necessity, only an online, real-time monitoring transaction processing system can revert these plagues associated with manual procedures of power monitoring system.

The question of turning to the computerized system rather than partially automated system which serves which serves as an impediments and discomfort due to poor operating environment becomes another problem to be resolved.

1.3     Theoretical Background

The National Electric Power Authority (NEPA), which is now known as Power Holding Company of Nigeria (PHCN), was established by decree 24 of 1972 via the then electricity corporation of Nigeria and the Niger Dan Authority (NDA). It was accorded the mandate to generate, transmit, distribute, and market electricity.

It has on its own the task to develop and to maintain an efficient coordinated and economical system of electricity supply to all parts of Nigeria and other parts of West Africa like Benin republic, Ghana and Niger republics in the northern part of Nigeria. In the bid to meet with its statutory responsibility geared towards the satisfaction of its customers need worldwide constitute the establishment of the Alausa-Ikeja road office, which has been functional over decades.

Past, the system was not well efficient because the manipulations of the system were handled solely using humans’ operations which constituted different errors. In our time, it has become necessary to implement modern approaches to technology in order to manage activities of an organization.

1.4     Objectives of the Study

The objective of this study is to show how a computerized system can be built for the PHCN Uyo, to aid the handle of electricity monitoring and bill presentation for customers. The study examines the distinction between a manual and computerized system, and intends to settle the problems created by manual systems by modeled automated systems.

To employ Information Technology (IT) potentials in customers service and the organization as a whole, as well as to ascertain whether computerized system is of positive impact to the general service structure or a threat to the staff’s job security.

1.5     Significance of the Study

Owing to the apparent and deliberate cynic approach of people towards the issue of whether or power monitoring system is expedient, the research project has the under-listed significance:

Eliminates the problems inherent in the old power monitoring system/procedure by offering an automated real-time data processing approach. Reduce complaints by aggrieved customers owing to poor service thereby upholding the corporate image of PHCN. Educate PHCN officials of the use of computing operations to carry out transactions. To ginger further study and research on the topic by other students and academicians.

1.6     Scope of the Study

The scope of this study is focused on power monitoring in PHCN. It considers the procedures used for managing the billing system in PHCN and how a computerized system can contribute to the betterment of these activities. The study uses Power Holding Company of Nigeria (PHCN), Uyo as its case study.

1.7     Definition of Terms

Electric Power: Electric power is the rate of energy consumption in a circuit. The electric power is measured in units of watts.

Capacitor: This is a passive two-terminal component used to store energy in an electric field.

Monitoring: This generally means to be aware of the state of the system in order to control the system effectively.

Bills: This is an amount of money owed for goods supplied or services rendered, set out in a printed or written statement of charge that is to be paid for at a later date by the consumers.

Voltage: This is the potential energy that makes the electrical current flow in circuit by pushing the electrons around. It is how we measure the difference in electrical energy.

Supply: This is the amount of electrical energy that is being released to a particular circuit within a particular. Supply determines the consumption of power.

 

  DOWNLOAD THE FULL PROJECT

DESIGN AND IMPLEMENTATION COMPUTERIZED POWER MONITORING SYSTEM

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DESIGN AND IMPLEMENTATION COMPUTERIZED POWER MONITORING SYSTEM INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DESIGN AND IMPLEMENTATION COMPUTERIZED POWER MONITORING SYSTEM?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DESIGN AND IMPLEMENTATION COMPUTERIZED POWER MONITORING SYSTEM?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DESIGN AND IMPLEMENTATION COMPUTERIZED POWER MONITORING SYSTEM, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!