Select Currency
Translate this page

EFFECT OF GAS-OIL-RATIO ON OIL PRODUCTION

Format: MS WORD  |  Chapter: 1-5  |  Pages: 75  |  2044 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE FULL PROJECT

EFFECT OF GAS-OIL-RATIO ON OIL PRODUCTION

 

ABSTRACT

Maximum production from an oil well can be achieved through proper selection of tubing size. The selection of optimum tubing size must be evaluated when completing a well in any type of reservoir especially solution gas drive reservoir since there is likelihood of producing more gas as the reservoir pressure declines. The most widely used methods such as Tarner, Muskat and Tracy methods for predicting the performance of a solution gas drive reservoir were discussed and used to estimate the behaviour of producing GOR. A comparison was made between the results from each method. System analysis approach was adopted for this study. The future IPR curves were determined by a combination of Vogel and Fetkovich correlation. Beggs and Brill multiphase spreadsheet was used to produce the TPR curves by estimating flowing bottomhole pressure for several tubing size using the predicted GOR produced and a range of flowrates. The effect of water production was also considered in this study. The results showed that for IPR5 as GOR increased from 1052 to 1453 scf/stb, oil production rate for 2 7/8-in increased by 17.6% and 3.3% for a further increase in GOR at 2610 scf/stb. At a GOR of 2610 scf/stb oil production decreased by 3.17% at water-cut of 5% and 9.5% at water-cut of 25%. All things being equal, the percentage reduction in production reduces as GOR increases from 2610 to 5635 scf/stb for all the tubing sizes used.

 

CHAPTER ONE

INTRODUCTION

BACKGROUND OF THE STUDY

Production optimization identifies the opportunities to increase production and reduce operating costs. The overall goal is to achieve the optimum profitability from the well. To achieve and maintain this, it is essential to evaluate and monitor different sections of the production system including, the wellbore sandface, reservoir, produced fluids, production equipment on surface and downhole. Several methods are being used for production optimization. The most common and widely used method is the system analysis approach commonly known as nodal analysis.

Optimization of the wellbore is considered mainly during well completion stages. Tubing joints vary in length from 18 to 35 feet although the average tubing joint is approximately 30 feet. Tubing is available in a range of outer diameter sizes. The most common sizes are 2 3/8-in, 2 7/8-in, 3 1/2-in and 4 1/2-in. The API defines tubing as pipe from 1-in to 4 1/2-in OD. Larger diameter tubulars (4 1/2-in to 20-in) are being termed casing. (Schlumberger, 2011).

The flow rate per well is the key parameter. It governs the number of wells that need to be drilled to achieve the optimum economic output of the field. The first parameter that needs to be considered in the tubing string selection is the nominal tubing diameter. The grades of steel and nominal weight are chosen based on the stress the tubing will have to withstand during production. Thirdly, depending on the how corrosive the existing and future effluents, the type of connection and the metallurgy are selected. In fact the different stages mentioned above overlap and sometimes make the choice of tubing a difficult job. In the determination of the nominal pipe diameter, the nominal diameter through the weight governs the inside through diameter of the pipe. The flows that can pass through it depend on the acceptable pressure losses but are also limited by two parameters: the maximum flow rate corresponding to the erosion velocity and the minimum flow rate necessary to achieve lifting of water or condensate. Tubings with diameter less than 2 7/8-in are mostly reserved for operations on well using concentric pipe and are termed macronic string. Note also that the space required by couplings of the tubing limits the nominal tubing diameter that can be run into the production casing. (Perrin, et al., 2015).

Vertical Lift Problems relating to tubing

In lieu of the usefulness of tubing strings in oil and gas production, it can have some limitations. Tubing wear occurs most often in pumping wells. It depends little upon whether the hole is vertical or slanting, but it is much worse in dog-legged holes regardless of the deviation. It may either be external or internal. If external, it is usually the couplings which are affected and the cause is the rubbing against the inside of the casing in phase with the reversing strokes of the sucker rods. If the wear is internal, it is caused by the sucker rods. There can be leakage from the inside to the outside or vice versa. This can be attributed to the API thread shape used (the V-shaped or round thread shape.) The tubing string can be flattened from wall to wall by either having a higher hydrostatic pressure or as a result of diastrophic shifting of formation caused by an earthquake. Since some 90 percent of all oil-well tubing is upset design, practically all failures are in the body of the pipe. However, any tension failures are rare because tubing is almost always run inside of casing and except for occasional trouble of unseating packers; it seldom becomes stuck and therefore needs not be pulled on. As with upset casing, upset tubing will stretch before failing. The tubing will burst when the pressure inside the tubing string is higher than the pressure in that annulus.

  DOWNLOAD THE FULL PROJECT

EFFECT OF GAS-OIL-RATIO ON OIL PRODUCTION

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON EFFECT OF GAS-OIL-RATIO ON OIL PRODUCTION INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on EFFECT OF GAS-OIL-RATIO ON OIL PRODUCTION?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on EFFECT OF GAS-OIL-RATIO ON OIL PRODUCTION?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for EFFECT OF GAS-OIL-RATIO ON OIL PRODUCTION, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!