Select Currency
Translate this page

DEVELOPMENT OF A COMPUTER PROGRAM FOR SOLIDS CONTROL

Format: MS WORD  |  Chapter: 1-5  |  Pages: 74  |  3178 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE FULL PROJECT

DEVELOPMENT OF A COMPUTER PROGRAM FOR SOLIDS CONTROL

 

ABSTRACT

Computer software is used extensively to increase productivity and reduce man’s hours of labour. This work presents the development of a solids control software (SOLCON) which is designed for real time mud system management and quick performance of routine rig computations: determination of total solids and low gravity solids content; mud property and density control requiring optimal ejection rate into the mixing pit; volume of mud and amount of barite, bentonite and additives to be added during the upgrading process of the mud. This software has the ability to evaluate the need for dilution depending on the maximum allowable drilled solids, viscosity and recommended total solids in the drilling fluid. Finally, this software provides the atmosphere to control drilled solids as quickly as possible with all the necessary parameters.

 

CHAPTER ONE

FORMULATION OF THE PROBLEM

1.1   Introduction

Drilling fluid was introduced into the rotary drilling technology as means of transporting the drilled solids to the surface. Other function of the drilling fluids are controlling subsurface pressure, lubricating the drill string, cleaning the bottom of the hole, aiding in formation evaluation protecting formation productivity and aiding formation stability (Moore, 1986). One major function of the rig circulation system is the removal of drilled solids from the drilling mud before recirculation because of the adverse effects the drilled solids have on the drilling rate. One way of reducing drilling cost is the maximization of drilled solids removal from the drilling fluid (Field, 1972). For sometimes now the industry has battled with various unsatisfactory solutions to the problem of solids control. These included the following:

1. A piecemeal, temporary and very expensive way to reduce solids content is by discarding part of the system and rebuilding volume with added solids, water and chemical additives.

2. The use of „inhibitors‟ such as lime and polymers to reduce the contribution of drilled solids to mud. Generally, these materials only delays the time when a mud must be discarded.

3. A benefit more apparent than real way is the use „thinners‟. Thinners can reduce the gel strength and the yield point of the mud (Nelson, 1970).

There are direct and indirect costs associated with drilled solids. The direct cost involves dilution and discarding of the excess volume of mud. The indirect cost is connected to the increase mud weight resulting from the presence of drilled solids in the drilling fluid. This may results in pressure differential between the drilling fluid and the formation fluid and hence reduction in rate of penetration. A reduction in hole cleaning ability as result of an increase in plastic viscosity may also lead to reduction in rate of penetration and generation of finer cuttings (Wells, 1976). Low rate of penetration increases rig time and in tend increase the cost of drilling. In order to maintain a low specific gravity of solids in the drilling fluid, about one- quarter of the volume of the drilling fluid containing the drilled solids is removed.

The three basic way to control the concentration of drilled solids in drilling fluids are; removal of solids, adding solids or their equivalent and treating solids chemically. Soluble solids and clay is added to increase yield point, gel strength, plastic viscosity and decrease filtration rate with minimum weight increase. To increase the density of the mud, barite is added with minimum effect on the mud properties and solid volume. It is necessary to control the concentration of the drilled solids in the drilling fluid before returning it in to the drill pit. The more effectively the solids are mechanically removed the less dilution and hence the lesser the chemical treatment required (Moore, 1986).

  DOWNLOAD THE FULL PROJECT

DEVELOPMENT OF A COMPUTER PROGRAM FOR SOLIDS CONTROL

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DEVELOPMENT OF A COMPUTER PROGRAM FOR SOLIDS CONTROL INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DEVELOPMENT OF A COMPUTER PROGRAM FOR SOLIDS CONTROL?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DEVELOPMENT OF A COMPUTER PROGRAM FOR SOLIDS CONTROL?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DEVELOPMENT OF A COMPUTER PROGRAM FOR SOLIDS CONTROL, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!