Select Currency
Translate this page

EVALUTION OF THE ENVIRONMENTAL RADIOACTIVITY AROUND DANGOTE CEMENT ESCAVATION SITE

Format: MS WORD  |  Chapter: 1-5  |  Pages: 74  |  2257 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE FULL PROJECT

EVALUTION OF THE ENVIRONMENTAL RADIOACTIVITY AROUND DANGOTE CEMENT ESCAVATION SITE

 

ABSTRACT

The aim of this research work is to measure and analyse the environmental radioactivity around Dangote cement, excavation site. To obtain data that will serve as reference material for environment assessment. The method of radiation measurement employed in this work, was direct observation and measurement of radiation from the excavation site using the radiation detectors. These detectors were held one meter above the radioactive sources at various distances of the mining excavation site of Dangote Cement Factory, Gboko. Finally, the background count was taken 200 meters from the excavation site. Readings were taken from two points 300 meters away from each other named excavation point A and B and 3 sets of readings each was taken at each point of measurement for every two minutes The direct observation and measurement of radiation from the excavation site using the radiation detector was obtained at significant values and the difference between them were almost the same. At point A, from table 4.1 the result shows the various average dose rates at various time intervals, with an insignificant average dose of 0.0333±0.0133(mSv/yr). From table 4.2, it shows an insignificant level of average exposure of 0.176±0.015(mR/hr). From table 4.3, the average activity shows an insignificant average activity of 3.46±0.19(KBq). From table 4.4, shows the average dose at point B, with an insignificant average of 0.352±0.434(mSv/yr). From table 4.5, it shows the average exposure an insignificant total average of 0.2668±0.078(mR/hr). From table 4.6, it shows average activity with an insignificant total average of 3.06±0.300(KBq). Therefore, this indicates that the result from the radiation excavates obtained was insignificant at a significance level of 1mSv/yr as recommended by the ICRP. The level of activities carried out by the people around the site must be reduced, because continuous accumulation of radiation may still result to health hazard. It is therefore recommended that there should be occupational and public awareness on the presence of natural radiation especially of limestone mining and cement production in the environment and their possible health hazards, background radiation and proper health monitoring should also be part of environmental assessment for industrial and mining project.

  DOWNLOAD THE FULL PROJECT

EVALUTION OF THE ENVIRONMENTAL RADIOACTIVITY AROUND DANGOTE CEMENT ESCAVATION SITE

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON EVALUTION OF THE ENVIRONMENTAL RADIOACTIVITY AROUND DANGOTE CEMENT ESCAVATION SITE INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on EVALUTION OF THE ENVIRONMENTAL RADIOACTIVITY AROUND DANGOTE CEMENT ESCAVATION SITE?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on EVALUTION OF THE ENVIRONMENTAL RADIOACTIVITY AROUND DANGOTE CEMENT ESCAVATION SITE?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for EVALUTION OF THE ENVIRONMENTAL RADIOACTIVITY AROUND DANGOTE CEMENT ESCAVATION SITE, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!