DESIGN AND IMPLEMENTATION OF COMPUTER BASED SCHEDULING SYSTEM FOR A TRANSPORT COMPANY

Format: MS WORD  |  Chapter: 1-5  |  Pages: 75  |  512 Users found this project useful  |  Price ₦3,000

GET THE COMPLETE PROJECT

DESIGN AND IMPLEMENTATION OF COMPUTER BASED SCHEDULING SYSTEM FOR A TRANSPORT COMPANY.

 

ABSTRACT

This project work is all about design and implementation of a computer based scheduling system for a transport company. A computer based scheduling system for a transport company generates optimal luxury bases and driver schedules for a given dispatching scenario. It is a stand-alone windows based application with extremely user’s friendly interface. It consists of data management and scheduling modules. This project work with vividly deal with the impact of computer based schedule system for a transport company.

 

ORGANIZATION OF WORK

This research work takes a look at the application of a computer in scheduling in a transport company, that will generate optimal luxury buses and driver schedules for a given dispatching scenario. Chapter one introduce the statement of the problems, explains the purpose of the study and the aims and objectives of the research work. It gave the general overview of the conventional method the extent it will cover (scope), its limitations and definition of some terms related to scheduling. Chapter two reviews the related literature. Chapter three described and analysis the existing system. Fact finding method used are also discussed. It explains the problems of the existing system and finally justifies the new system. Chapter four deals with the actual research work done, designing of the new system computer base scheduling also highlights the system requirement. Chapter five discusses the actual simulation of the new system. Chapter six contains the system documentation user manual. Finally, chapter seven briefly summaries concludes the project & recommends the user of the new system.

 

CHAPTER ONE

INTRODUCTION

A scheduling situation in a transport company develops when buses are expected to dispatch effectively. Scheduling needs the dispatch and general information about routes to generate optimal transportation resources schedules. Lack of management and scheduling modules have cause a big problem for most transport companies. As a result of these problems, these transport companies have not been able to present charts and text reports for these companies. These transport companies can not export solutions as text files in MS Word or MS Excel. Lack of scheduling algorithms have led to lack of generating of the different resources schedules. Lack of near-optimal resources schedules generation have prevented benchmarking an existing solution.

Existing routes along with resources assignments can not be imported into the system “as is’ and calculate to reproduce the benchmark solution. The solution can not be generated and compared to the benchmark solution. The two solutions cannot be compared in the form of reports and Grantt Charts to identify opportunities for better resources utilizations. Route data can not be imported in the form of ASCLL files. There is no data import wizard that will guide user’s through a set up process for importing route data into the system. Lack of data view to enable user’s to sort the routes based on different criteria (route ID) Departure Time etc).

PURPOSE OF THE STUDY

This research work is meat to find out whether the above mentioned problems can effectively be eradicated by employing computer system to control the scheduling system of a transport company. In other words, to find solution to these problems mentioned above using a computer system.

AIMS AND OBJECTIVES

The aim and objective of this research work is to come up with a more suitable scheduling system in a transport company. (A computer based scheduling system) that can eliminate completely the above mentioned problems using a computer system. For instance, to come up with a scheduling system that can generate optimal buses and driver schedules for a given dispatching scenario. Perhaps, the new system will not just eradicate the problems which will automatically improve the schedules.

SCOPE OF THE STUDY

This project work covers every area of scheduling activities where a scheduling tool generates optimal buses and drives schedules for a given dispatching scenario. For instance, this tool provides an estimate of required number of buses and drivers for a particular dispatching scenario. It also generates resource scheduling that can result in significant cost reduction by using the optimal numberof resources required.

GET THE COMPLETE PROJECT

Not What You Are Looking For?



For QUICK Help Call Us Now!

+234 813 292 6373


Here's what our amazing customers are saying

JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent

HOW TO GET YOUR COMPLETE PROJECT INSTANTLY

  • Select 3 Project Topics of your choice from your Department.
  • Submit the 3 topics to your Supervisor for Approval.
  • Call Our Instant Help Desk on 0813-292-6373 and Get Your Complete Project Material Instantly.
  • All project materials on this website are well researched by professionals with high level of professionalism.

FREQUENTLY ASKED QUESTIONS

How do i choose a Project Topic?

Look for your department and select any topic of your choice

I have a fresh topic that is not on your website. How do I go about it?

How fast can i get a complete project from your website?

Within 15 minutes if the exact project topic is on our website

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

One of your topics suites my project, but the case study is different. What do i do?

Call Our Instant Help Desk Now: (+234) 813-292-6373 and you will be responded to immediately

How do i get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: (+234) 813-292-6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: (+234) 813-292-6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: (+234) 813-292-6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!